Work Breakdown Structure

High-level Work Breakdown Structure for a satellite project including launch into orbit:

Here is a sample high-level Work Breakdown Structure for a satellite project including launch into orbit:

1. Project Planning
1.1 Develop requirements
1.2 Create project schedule and budget
1.3 Select suppliers and partners

2. Satellite Design
2.1 Develop mechanical design
2.2 Design electrical system
2.3 Design onboard software

3. Manufacturing
3.1 Procure components
3.2 Assemble satellite bus
3.3 Integrate payloads

4. Integration & Testing
4.1 Conduct subsystem testing
4.2 Integrate systems
4.3 Perform environmental testing

5. Launch Operations
5.1 Procure launch services
5.2 Transport to launch site
5.3 Configure for launch

6. Launch
6.1 Liftoff
6.2 Deploy satellite

7. Commissioning
7.1 Orbital checkout
7.2 Calibrate payloads
7.3 Validate performance

8. Satellite Operations
8.1 Ground system setup
8.2 Commence mission
8.3 Decommission

9. Project Management
9.1 Schedule tracking
9.2 Cost control
9.3 Risk management

Let me know if you need me to expand or clarify any part of this satellite project WBS. Proper breakdown is key to managing all elements involved in designing, building and launching a satellite to operate successfully in orbit.


Awalludin Ramlee

417 blog posts

Reacties